CAUTION: DO NOT MIX MATERIAL BEARING DIFFERENT LOT NUMBERS, REFER TO THE LOT NUMBERS LOCATED ON THE SIDE OF THE BUNDLE.
Note: Off ridge vents should be used. Use of shingle-over ridge vent may affect the impact resistance classification.
Complete shingle application on roof deck before applying Hip & Ridge Shingles. Hip Shingles must be applied before Ridge Shingles. Note: If a new roof is being applied over an existing roof, remove the old Hip & Ridge Shingles to obtain a level application. Each shingle is perforated for separation into 3 Hip & Ridge Shingles.
Precautionary Note:
The manufacturer will not be responsible for problems resulting from any deviation from the recommended application instructions and the following precautions:
Roof Top Loading: Lay shingle bundles flat. Do not bend over the ridge.
Roof Deck: Minimum 6 inch roof deck boards, minimum 3/8 inch plywood, minimum 7/16 OSB, sheathing spaced minimum 1/8 inch and maximum 1/4 inch.
Regardless of deck type used, the roofing installer must:
- Install the deck material in strict compliance with the deck manufacturer’s instructions.
- Prevent the deck from getting wet before, during and after installation.
Ventilation: Must comply with local building codes.
Handling: Use extra care in handling shingles when the temperature is below 40°F.
Storage: Store in a covered ventilated area at a maximum temperature of 110°F. Bundles should be stacked flat. Do not store near steam pipes, radiators, etc.
Fastener Requirement: Use galvanized steel, stainless steel or aluminum nails minimum 12 gauge shank with 3/8 inch diameter head. Owens Corning Roofing recommends that fasteners comply with ASTM F1667. Must comply with local building codes.
All Fasteners must penetrate at least 3/4 inch into the wood deck or completely through sheathing.
Notice: Owens Corning Roofing requires the use of nails as the method of attaching shingles to wood decking.